Wage Determination MO20260002-15764-bld

Audrain, MO · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260002-15764-bld covers 27 trade classifications for building construction in Audrain, MO. Total packages (base + fringe) range from $19.38/hr to $82.53/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260002-15764-bld
Revision: 1
Type: building
County: Audrain
State: MO
Effective: May 17, 2026
Trades covered: 27
Highest rate: $82.53/hr
Official source: SAM.gov reference MO20260002View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER $41.30 $21.85 $63.15 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION $39.53 $21.85 $61.38 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $41.67 $31.25 $72.92 $0.00 $0.00 $0.00 $0.00
LABORER $28.78 $16.05 $44.83 $0.00 $0.00 $0.00 $0.00
LABORER $30.78 $16.05 $46.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 $0.00 $0.00 $0.00 $0.00
PAINTER $28.56 $17.21 $45.77 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 $0.00 $0.00 $0.00 $0.00
View all WDs for Audrain → Revision history →