Wage Determination MO20260002-15764-bld
Audrain, MO · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260002-15764-bld covers 27 trade classifications for building construction in Audrain, MO. Total packages (base + fringe) range from $19.38/hr to $82.53/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260002-15764-bld
Revision: 1
Type: building
County: Audrain
State: MO
Effective: May 17, 2026
Trades covered: 27
Highest rate: $82.53/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER | $41.30 | $21.85 | $63.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION | $39.53 | $21.85 | $61.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $37.60 | $22.14 | $59.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $26.44 | $0.00 | $26.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $14.19 | $5.19 | $19.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.78 | $16.05 | $44.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $30.78 | $16.05 | $46.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $28.56 | $17.21 | $45.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $50.66 | $23.34 | $74.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $52.60 | $29.93 | $82.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $50.66 | $23.34 | $74.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $52.60 | $29.93 | $82.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.60 | $19.99 | $53.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $36.51 | $22.39 | $58.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.79 | $21.31 | $54.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | $0.00 | $0.00 | $0.00 | $0.00 |