Pipe Installation On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringes — Prevailing Wage Rates
Davis-Bacon prevailing wages for Pipe Installation On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringess across all covered states and counties. Rates vary by location and construction type.
Across 26 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Pipe Installation On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringes is $74.00/hr, with the middle 80% of counties paying between $74.00 and $74.00/hr. The highest state average is Missouri at $74.00/hr; the lowest is Missouri at $74.00/hr.
Range: $74.00 – $74.00/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
26 county-level rates for Pipe Installation On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringes, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Audrain | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Butler | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Camden | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Carter | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Chariton | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Cooper | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Dunklin | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Howell | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Iron | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Madison | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Mississippi | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| New Madrid | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Oregon | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Pemiscot | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Perry | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Phelps | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Pulaski | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Ralls | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Reynolds | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Ripley | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Shannon | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| St Francois | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Ste Genevieve | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Stoddard | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Texas | MO | building | $50.66 | $23.34 | $74.00 | WD → |
| Wayne | MO | building | $50.66 | $23.34 | $74.00 | WD → |