OPERATOR: Power Equipment GROUP 9 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: Power Equipment GROUP 9s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 27 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: Power Equipment GROUP 9 is $74.54/hr, with the middle 80% of counties paying between $60.64 and $74.54/hr. The highest state average is California at $74.54/hr; the lowest is Michigan at $60.64/hr.

Bottom 10%
$60.64
Median
$74.54
Average
$68.36
Top 10%
$74.54

Range: $60.64 – $74.54/hr across 2 states. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $49.29/hr
Avg total: $74.54/hr
15 rates
Michigan MI
Avg base: $35.29/hr
Avg total: $60.64/hr
12 rates

All Rates

27 county-level rates for OPERATOR: Power Equipment GROUP 9, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Fresno CA residential $49.29 $25.25 $74.54 WD →
Imperial CA residential $49.29 $25.25 $74.54 WD →
Kern CA residential $49.29 $25.25 $74.54 WD →
Los Angeles CA residential $49.29 $25.25 $74.54 WD →
Madera CA residential $49.29 $25.25 $74.54 WD →
Merced CA residential $49.29 $25.25 $74.54 WD →
Orange CA residential $49.29 $25.25 $74.54 WD →
Riverside CA residential $49.29 $25.25 $74.54 WD →
San Bernardino CA residential $49.29 $25.25 $74.54 WD →
San Joaquin CA residential $49.29 $25.25 $74.54 WD →
San Luis Obispo CA residential $49.29 $25.25 $74.54 WD →
Santa Barbara CA residential $49.29 $25.25 $74.54 WD →
Stanislaus CA residential $49.29 $25.25 $74.54 WD →
Tulare CA residential $49.29 $25.25 $74.54 WD →
Ventura CA residential $49.29 $25.25 $74.54 WD →
Macomb MI heavy $35.29 $25.35 $60.64 WD →
Macomb MI building $35.29 $25.35 $60.64 WD →
Monroe MI building $35.29 $25.35 $60.64 WD →
Monroe MI heavy $35.29 $25.35 $60.64 WD →
Oakland MI heavy $35.29 $25.35 $60.64 WD →
Oakland MI building $35.29 $25.35 $60.64 WD →
St Clair MI building $35.29 $25.35 $60.64 WD →
St Clair MI heavy $35.29 $25.35 $60.64 WD →
Washtenaw MI heavy $35.29 $25.35 $60.64 WD →
Washtenaw MI building $35.29 $25.35 $60.64 WD →
Wayne MI heavy $35.29 $25.35 $60.64 WD →
Wayne MI building $35.29 $25.35 $60.64 WD →
Top-paying counties for OPERATOR: Power Equipment GROUP 9 →