Abatement) All Other Work — Prevailing Wage Rates
Davis-Bacon prevailing wages for Abatement) All Other Works across all covered states and counties. Rates vary by location and construction type.
Quick Answer
Across 22 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Abatement) All Other Work is $57.16/hr, with the middle 80% of counties paying between $55.23 and $57.16/hr. The highest state average is California at $56.87/hr; the lowest is California at $56.87/hr.
Bottom 10%
$55.23
Median
$57.16
Average
$56.87
Top 10%
$57.16
Range: $55.02 – $57.16/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
22 county-level rates for Abatement) All Other Work, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Imperial | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Imperial | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | residential | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Santa Barbara | CA | heavy | $36.44 | $18.58 | $55.02 | WD → |
| Santa Barbara | CA | highway | $36.44 | $18.58 | $55.02 | WD → |
| Santa Barbara | CA | building | $36.44 | $18.58 | $55.02 | WD → |