Residential Construction — Sedgwick, Kansas

WD KS20260002-15238-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Sedgwick, Kansas (construction type: residential) is $12.42/hr base + $0.00/hr fringe = $12.42/hr total package (WD KS20260002-15238-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: KS20260002-15238-res
Revision: 1
Construction Type: residential
State: Kansas (KS)
County: Sedgwick
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference KS20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.42 $0.00 $12.42 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.26 $0.00 $11.26 -54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.05 $17.80 $55.85 +88% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $10.39 $0.00 $10.39 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CARPENTER TENDER $8.14 $0.00 $8.14 -62% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UNSKILLED $8.17 $0.00 $8.17 Above median -62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $12.64 $0.00 $12.64 -41% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $13.73 $0.73 $14.46 -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $10.24 $0.00 $10.24 Above median -58% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $10.88 $1.54 $12.42 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADERS $9.91 $0.00 $9.91 -59% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER, MULTI-PURPOSE $11.71 $0.00 $11.71 -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLERS, ALL TYPES $8.65 $0.00 $8.65 -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPERS $9.63 $1.29 $10.92 Top 10% -55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCREED/CONCRETE $9.63 $0.00 $9.63 -60% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $8.61 $0.00 $8.61 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 1-2 AXLE $8.53 $0.00 $8.53 -69% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 2-3 AXLE $8.86 $1.43 $10.29 -62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: TANDEM/3 AXLE $8.00 $0.00 $8.00 -71% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sedgwick, KS — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sedgwick

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260002-15238-res →