Heavy Construction — Sedgwick, Kansas
WD KS20260159-15238-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Sedgwick, Kansas (construction type: heavy) is $19.22/hr base + $3.07/hr fringe = $22.29/hr total package (WD KS20260159-15238-hvy, Rev. 1).
Scroll down for all 17 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $19.22 | $3.07 | $22.29 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $24.15 | $6.18 | $30.33 Above median +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 Above median +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.64 | $18.29 | $58.93 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $39.00 | $34.25 | $73.25 Above median +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.84 | $3.59 | $19.43 Above median -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.03 | $2.88 | $18.91 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 | $80.12 +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.92 | $6.20 | $29.12 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.45 | $8.52 | $32.97 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $29.82 | $6.41 | $36.23 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $20.14 | $3.64 | $23.78 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $31.50 | $16.88 | $48.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.57 | $21.69 | $61.26 Above median +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 | $61.26 Above median +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.57 | $21.69 | $61.26 Above median +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.95 | $9.62 | $34.57 Top 10% +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sedgwick, KS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sedgwick
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Sedgwick, Kansas.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.