Building Construction — Sedgwick, Kansas

WD KS20260057-15238-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) in Sedgwick, Kansas (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD KS20260057-15238-bld, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: KS20260057-15238-bld
Revision: 1
Construction Type: building
State: Kansas (KS)
County: Sedgwick
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference KS20260057View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) $45.60 $35.47 $81.07 Top 10% +261% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.62 $1.93 $19.55 -21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.17 $2.23 $19.40 -20% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.64 $18.29 $58.93 +98% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL $60.69 $38.44 $99.13 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $27.49 $13.63 $41.12 +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL/REINFORCING $39.00 $34.25 $73.25 +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.16 $1.44 $14.60 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $19.91 $6.88 $26.79 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.55 $1.67 $13.22 -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.50 $3.49 $23.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $33.12 $13.96 $47.08 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $33.19 $14.16 $47.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $34.83 $14.16 $48.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $29.58 $11.51 $41.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $30.35 $12.04 $42.39 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $33.78 $13.64 $47.42 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $36.18 $19.97 $56.15 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.90 $19.94 $65.84 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $55.56 $25.80 $81.36 Above median +169% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $23.12 $6.86 $29.98 -1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.93 $22.42 $62.35 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.33 $1.66 $14.99 -34% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.25 4.42 SHEET METAL WORKER $24.84 $6.82 $31.66 +29% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLER $41.83 $27.60 $69.43 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.74 $1.46 $22.20 -17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $30.18 $13.52 $43.70 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $19.63 $5.26 $24.89 -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sedgwick, KS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.