Highway Construction — Sedgwick, Kansas

WD KS20260147-15238-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Sedgwick, Kansas (construction type: highway) is $18.66/hr base + $0.00/hr fringe = $18.66/hr total package (WD KS20260147-15238-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: KS20260147-15238-hwy
Revision: 1
Construction Type: highway
State: Kansas (KS)
County: Sedgwick
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference KS20260147View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.66 $0.00 $18.66 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.80 $0.00 $16.80 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.64 $18.29 $58.93 +98% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.28 $0.00 $18.28 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $34.25 $73.25 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $12.95 $0.51 $13.46 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.61 $0.00 $14.61 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.21 $14.63 $43.84 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $12.09 $0.00 $12.09 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $26.56 $13.05 $39.61 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.71 $0.00 $20.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.68 $0.00 $16.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.03 $0.00 $14.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.27 $0.00 $19.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $17.95 $0.00 $17.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.97 $0.00 $22.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $16.46 $0.00 $16.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.35 $0.00 $18.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.42 $0.00 $17.42 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $17.24 $0.00 $17.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $22.96 $0.00 $22.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.30 $0.00 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.29 $0.00 $15.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL $18.87 $0.00 $18.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $16.36 $0.00 $16.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.88 $0.00 $17.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $17.05 $0.00 $17.05 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $27.02 $12.14 $39.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.66 $0.00 $16.66 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $14.43 $0.00 $14.43 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION $16.40 $0.00 $16.40 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $17.08 $0.00 $17.08 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $23.23 $9.89 $33.12 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $19.06 $0.00 $19.06 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.94 $11.51 $33.45 Above median +22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sedgwick, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sedgwick

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260147-15238-hwy →