Highway Construction — Sedgwick, Kansas
WD KS20260147-15238-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Sedgwick, Kansas (construction type: highway) is $18.66/hr base + $0.00/hr fringe = $18.66/hr total package (WD KS20260147-15238-hwy, Rev. 1).
Scroll down for all 37 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $18.66 | $0.00 | $18.66 Above median -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.80 | $0.00 | $16.80 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.64 | $18.29 | $58.93 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $18.28 | $0.00 | $18.28 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 Top 10% +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $12.95 | $0.51 | $13.46 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.61 | $0.00 | $14.61 Above median -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $29.21 | $14.63 | $43.84 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $12.09 | $0.00 | $12.09 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $26.56 | $13.05 | $39.61 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.71 | $0.00 | $20.71 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.68 | $0.00 | $16.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $14.03 | $0.00 | $14.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.27 | $0.00 | $19.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $17.95 | $0.00 | $17.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $22.97 | $0.00 | $22.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $16.46 | $0.00 | $16.46 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $18.35 | $0.00 | $18.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.42 | $0.00 | $17.42 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $17.24 | $0.00 | $17.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $22.96 | $0.00 | $22.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $17.30 | $0.00 | $17.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $15.29 | $0.00 | $15.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL | $18.87 | $0.00 | $18.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL GROUNDMAN | $16.36 | $0.00 | $16.36 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $17.88 | $0.00 | $17.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $17.05 | $0.00 | $17.05 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: STRIPING MACHINE | $27.02 | $12.14 | $39.16 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $16.66 | $0.00 | $16.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: SERVICE DRIVER | $14.43 | $0.00 | $14.43 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION | $16.40 | $0.00 | $16.40 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND TANDEM | $17.08 | $0.00 | $17.08 Above median -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.23 | $9.89 | $33.12 Above median +21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 Top 10% -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $21.94 | $11.51 | $33.45 Above median +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sedgwick, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sedgwick
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Sedgwick, Kansas.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.