LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL C — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL Cs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 2 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL C is $55.00/hr, with the middle 80% of counties paying between $55.00 and $55.00/hr. The highest state average is New York at $55.00/hr; the lowest is New York at $55.00/hr.

Bottom 10%
$55.00
Median
$55.00
Average
$55.00
Top 10%
$55.00

Range: $55.00 – $55.00/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$55.00/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+144.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $32.10/hr
Avg total: $55.00/hr
2 rates

All Rates

2 county-level rates for LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL C, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Onondaga NY heavy $32.10 $22.90 $55.00 WD →
Onondaga NY highway $32.10 $22.90 $55.00 WD →
Top-paying counties for LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL C →