Davis-Bacon Wage Determinations — Onondaga, New York

Onondaga has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Onondaga, New York cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: NY20260026-16123-bld Rev. 2
Effective: May 17, 2026
View trade rates →
heavy Active
WD: NY20260016-16123-hvy Rev. 2
Effective: May 17, 2026
View trade rates →
highway Active
WD: NY20260016-16123-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential Active
WD: NY20260087-16123-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Onondaga

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid heavy $64.59 $42.92 $107.51 WD →
2 Power equipment operators: GROUP 4 heavy $65.51 $33.40 $98.91 WD →
3 POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA highway $65.51 $33.40 $98.91 WD →
4 ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU heavy $61.56 $36.21 $97.77 WD →
5 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN heavy $61.56 $36.21 $97.77 WD →
6 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un highway $61.56 $36.21 $97.77 WD →
7 ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER heavy $63.14 $33.82 $96.96 WD →
8 ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA residential $58.44 $38.44 $96.88 WD →
9 IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS residential $42.63 $53.70 $96.33 WD →
10 POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, C heavy $60.35 $33.40 $93.75 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →