Wage Determination MO20260032-15910-bld

Taney, MO · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260032-15910-bld covers 45 trade classifications for building construction in Taney, MO. Total packages (base + fringe) range from $22.71/hr to $99.13/hr, with the highest going to VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260032-15910-bld
Revision: 2
Type: building
County: Taney
State: MO
Effective: May 17, 2026
Trades covered: 45
Highest rate: $99.13/hr
Official source: SAM.gov reference MO20260032View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.67 $19.48 $53.15 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.35 $18.06 $52.41 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $42.06 $22.40 $64.46 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $39.48 $22.40 $61.88 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $29.39 $21.25 $50.64 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES $32.40 $19.11 $51.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: STONE AND TANEY COUNTIES $28.65 $18.34 $46.99 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $51.01 $26.25 $77.26 $0.00 $0.00 $0.00 $0.00
GLAZIER $22.71 $0.00 $22.71 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $39.00 $34.25 $73.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $31.39 $29.20 $60.59 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $28.00 $13.18 $41.18 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $26.50 $13.18 $39.68 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $27.05 $13.62 $40.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $23.55 $7.47 $31.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.47 $0.00 $24.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37 $0.00 $0.00 $0.00 $0.00
PAINTER $33.90 $17.21 $51.11 $0.00 $0.00 $0.00 $0.00
PAINTER $19.75 $11.76 $31.51 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $33.90 $17.21 $51.11 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.39 $17.76 $43.15 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $34.90 $17.21 $52.11 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $39.35 $15.72 $55.07 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $39.35 $15.72 $55.07 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: GRADER/BLADE $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: LOADER $45.84 $22.42 $68.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: ROLLER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $14.51 $45.24 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $34.43 $17.86 $52.29 $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $15.99 $56.52 $0.00 $0.00 $0.00 $0.00
TILE SETTER $26.47 $14.89 $41.36 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS $60.69 $38.44 $99.13 $0.00 $0.00 $0.00 $0.00
View all WDs for Taney → Revision history →