ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMSs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS is $77.26/hr, with the middle 80% of counties paying between $53.06 and $77.26/hr. The highest state average is Missouri at $72.42/hr; the lowest is Missouri at $72.42/hr.
Range: $53.06 – $77.26/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Barry | MO | building | $32.25 | $20.81 | $53.06 | WD → |
| Barry | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Barton | MO | building | $32.25 | $20.81 | $53.06 | WD → |
| Barton | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Benton | MO | building | $32.25 | $20.81 | $53.06 | WD → |
| Benton | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Dade | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Douglas | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Henry | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Hickory | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Laclede | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Ozark | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| St Clair | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Stone | MO | building | $51.01 | $26.25 | $77.26 | WD → |
| Taney | MO | building | $51.01 | $26.25 | $77.26 | WD → |