ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIESs across all covered states and counties. Rates vary by location and construction type.
Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES is $51.51/hr, with the middle 80% of counties paying between $51.51 and $51.51/hr. The highest state average is Missouri at $51.51/hr; the lowest is Missouri at $51.51/hr.
Range: $51.51 – $51.51/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
9 county-level rates for ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Dade | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Douglas | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Henry | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Hickory | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Laclede | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Ozark | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| St Clair | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Stone | MO | building | $32.40 | $19.11 | $51.51 | WD → |
| Taney | MO | building | $32.40 | $19.11 | $51.51 | WD → |