Wage Determination IL20260006-16728-res

Kankakee, IL · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination IL20260006-16728-res covers 31 trade classifications for residential construction in Kankakee, IL. Total packages (base + fringe) range from $45.07/hr to $115.80/hr, with the highest going to OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: IL20260006-16728-res
Revision: 1
Type: residential
County: Kankakee
State: IL
Effective: May 17, 2026
Trades covered: 31
Highest rate: $115.80/hr
Official source: SAM.gov reference IL20260006View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/INSULATOR $55.02 $35.75 $90.77 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $53.10 $38.54 $91.64 $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON $32.24 $21.79 $54.03 $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON $42.98 $21.79 $64.77 $0.00 $0.00 $0.00 $0.00
CARPENTER; DRYWALL HANGER; PILEDRIVER; SOFT FLOOR LAYER $44.46 $40.96 $85.42 $0.00 $0.00 $0.00 $0.00
CATV INSTALLER $39.00 $33.78 $72.78 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.48 $33.36 $79.84 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.60 $45.00 $96.60 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY $70.68 $38.44 $109.12 $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN $44.02 $32.76 $76.78 $0.00 $0.00 $0.00 $0.00
GLAZIER $51.55 $44.09 $95.64 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $41.27 $32.76 $74.03 $0.00 $0.00 $0.00 $0.00
IRONWORKER $46.00 $39.30 $85.30 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORER AND SKILLED LABORER - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKI $42.25 $33.59 $75.84 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; DYNAMITE MAN; LEAD BASE PAINT ABATEMENT WORKER $43.25 $33.59 $76.84 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $33.95 $26.03 $59.98 $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $44.63 $26.83 $71.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI $64.80 $51.00 $115.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T $63.50 $51.00 $114.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS $59.20 $51.00 $110.20 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, TAPER, PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL $41.00 $27.80 $68.80 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $55.00 $38.62 $93.62 $0.00 $0.00 $0.00 $0.00
PLUMBER $55.40 $38.27 $93.67 $0.00 $0.00 $0.00 $0.00
PUMPS, WELL POINTS; WELDING MACHINES; WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT $60.95 $51.00 $111.95 $0.00 $0.00 $0.00 $0.00
ROOFER $50.25 $30.43 $80.68 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $56.35 $38.65 $95.00 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $38.84 $21.79 $60.63 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 OR 3 AXLES FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SH $44.82 $0.25 $45.07 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLES FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL B $44.97 $0.25 $45.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 5 AXLES FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL B $45.17 $0.25 $45.42 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 6 AXLES FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL B $45.37 $0.25 $45.62 $0.00 $0.00 $0.00 $0.00
View all WDs for Kankakee → Revision history →