OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOIs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI is $115.80/hr, with the middle 80% of counties paying between $115.80 and $115.80/hr. The highest state average is Illinois at $115.80/hr; the lowest is Illinois at $115.80/hr.

Bottom 10%
$115.80
Median
$115.80
Average
$115.80
Top 10%
$115.80

Range: $115.80 – $115.80/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $64.80/hr
Avg total: $115.80/hr
20 rates

All Rates

20 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Cook IL building $64.80 $51.00 $115.80 WD →
Cook IL residential $64.80 $51.00 $115.80 WD →
Cook IL highway $64.80 $51.00 $115.80 WD →
Cook IL heavy $64.80 $51.00 $115.80 WD →
Du Page IL residential $64.80 $51.00 $115.80 WD →
Du Page IL building $64.80 $51.00 $115.80 WD →
Grundy IL building $64.80 $51.00 $115.80 WD →
Grundy IL residential $64.80 $51.00 $115.80 WD →
Kane IL residential $64.80 $51.00 $115.80 WD →
Kane IL building $64.80 $51.00 $115.80 WD →
Kankakee IL building $64.80 $51.00 $115.80 WD →
Kankakee IL residential $64.80 $51.00 $115.80 WD →
Kendall IL residential $64.80 $51.00 $115.80 WD →
Kendall IL building $64.80 $51.00 $115.80 WD →
Lake IL residential $64.80 $51.00 $115.80 WD →
Lake IL building $64.80 $51.00 $115.80 WD →
McHenry IL building $64.80 $51.00 $115.80 WD →
McHenry IL residential $64.80 $51.00 $115.80 WD →
Will IL building $64.80 $51.00 $115.80 WD →
Will IL residential $64.80 $51.00 $115.80 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO; BOI →