Quick Answer

Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T is $114.50/hr, with the middle 80% of counties paying between $114.50 and $114.50/hr. The highest state average is Illinois at $114.50/hr; the lowest is Illinois at $114.50/hr.

Bottom 10%
$114.50
Median
$114.50
Average
$114.50
Top 10%
$114.50

Range: $114.50 – $114.50/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $63.50/hr
Avg total: $114.50/hr
16 rates

All Rates

16 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Du Page IL residential $63.50 $51.00 $114.50 WD →
Du Page IL building $63.50 $51.00 $114.50 WD →
Grundy IL building $63.50 $51.00 $114.50 WD →
Grundy IL residential $63.50 $51.00 $114.50 WD →
Kane IL building $63.50 $51.00 $114.50 WD →
Kane IL residential $63.50 $51.00 $114.50 WD →
Kankakee IL building $63.50 $51.00 $114.50 WD →
Kankakee IL residential $63.50 $51.00 $114.50 WD →
Kendall IL building $63.50 $51.00 $114.50 WD →
Kendall IL residential $63.50 $51.00 $114.50 WD →
Lake IL residential $63.50 $51.00 $114.50 WD →
Lake IL building $63.50 $51.00 $114.50 WD →
McHenry IL building $63.50 $51.00 $114.50 WD →
McHenry IL residential $63.50 $51.00 $114.50 WD →
Will IL residential $63.50 $51.00 $114.50 WD →
Will IL building $63.50 $51.00 $114.50 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T →