OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT Ts across all covered states and counties. Rates vary by location and construction type.
Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T is $114.50/hr, with the middle 80% of counties paying between $114.50 and $114.50/hr. The highest state average is Illinois at $114.50/hr; the lowest is Illinois at $114.50/hr.
Range: $114.50 – $114.50/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
16 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT; BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER; CONVEYOR, PORTABLE; FORKLIFT T, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Du Page | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Du Page | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| Grundy | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| Grundy | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Kane | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| Kane | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Kankakee | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| Kankakee | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Kendall | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| Kendall | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Lake | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Lake | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| McHenry | IL | building | $63.50 | $51.00 | $114.50 | WD → |
| McHenry | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Will | IL | residential | $63.50 | $51.00 | $114.50 | WD → |
| Will | IL | building | $63.50 | $51.00 | $114.50 | WD → |