POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTs across all covered states and counties. Rates vary by location and construction type.
Across 140 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT is $69.46/hr, with the middle 80% of counties paying between $69.46 and $77.41/hr. The highest state average is Illinois at $72.19/hr; the lowest is Illinois at $72.19/hr.
Range: $69.46 – $77.41/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
140 county-level rates for POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Adams | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Adams | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Alexander | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Bond | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Boone | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Brown | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Brown | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Brown | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Bureau | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Calhoun | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Carroll | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Cass | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Cass | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Cass | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Champaign | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Champaign | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Champaign | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Christian | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Christian | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Christian | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Clark | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Clark | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Clark | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Clay | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Clinton | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Coles | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Coles | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Coles | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Crawford | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Cumberland | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Cumberland | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Cumberland | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| De Kalb | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| De Witt | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| De Witt | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| De Witt | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Douglas | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Douglas | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Douglas | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Edgar | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Edgar | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Edgar | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Edwards | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Effingham | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Fayette | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Ford | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Franklin | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Fulton | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Gallatin | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Greene | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Hamilton | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Hancock | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Hardin | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Henderson | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Henry | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Iroquois | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Jackson | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Jasper | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Jefferson | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Jersey | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Jo Daviess | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Johnson | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Knox | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| La Salle | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Lawrence | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Lee | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Livingston | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Logan | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Logan | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Logan | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Macon | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Macon | IL | residential | $40.71 | $28.75 | $69.46 | WD → |
| Macon | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Macon | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Macoupin | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Marion | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Marshall | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Mason | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Mason | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Mason | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Massac | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| McDonough | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| McLean | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Menard | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Menard | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Menard | IL | residential | $40.71 | $28.75 | $69.46 | WD → |
| Menard | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Mercer | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Monroe | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Montgomery | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Morgan | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Morgan | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Morgan | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Moultrie | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |
| Moultrie | IL | highway | $47.21 | $30.20 | $77.41 | WD → |
| Moultrie | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Ogle | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Perry | IL | building | $40.71 | $28.75 | $69.46 | WD → |
| Piatt | IL | heavy | $47.21 | $30.20 | $77.41 | WD → |