POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25s across all covered states and counties. Rates vary by location and construction type.
Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 is $31.81/hr, with the middle 80% of counties paying between $31.81 and $31.81/hr. The highest state average is Louisiana at $31.81/hr; the lowest is Louisiana at $31.81/hr.
Range: $31.81 – $31.81/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
37 county-level rates for POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Acadia | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Ascension | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Bossier | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Caddo | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Calcasieu | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Cameron | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| De Soto | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| East Baton Rouge | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| East Feliciana | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Grant | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Iberia | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Iberville | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Jefferson | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Lafayette | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Lafourche | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Livingston | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Orleans | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Ouachita | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Plaquemines | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Pointe Coupee | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Rapides | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St Bernard | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St Charles | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St Helena | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St James | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St James | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St John the Baptist | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St John the Baptist | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St Martin | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| St Tammany | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Tangipahoa | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Terrebonne | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Union | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Vermilion | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| Webster | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| West Baton Rouge | LA | building | $23.46 | $8.35 | $31.81 | WD → |
| West Feliciana | LA | building | $23.46 | $8.35 | $31.81 | WD → |