Wage Determination LA20260041-15356-bld
Orleans, LA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination LA20260041-15356-bld covers 24 trade classifications for building construction in Orleans, LA. Total packages (base + fringe) range from $12.38/hr to $89.55/hr, with the highest going to ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: LA20260041-15356-bld
Revision: 2
Type: building
County: Orleans
State: LA
Effective: May 17, 2026
Trades covered: 24
Highest rate: $89.55/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $32.66 | $9.86 | $42.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $18.66 | $0.00 | $18.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | $19.37 | $2.46 | $21.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $30.47 | $7.97 | $38.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $16.55 | $0.00 | $16.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $18.21 | $4.90 | $23.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.00 | $16.66 | $52.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK | $51.11 | $38.44 | $89.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $25.44 | $12.20 | $37.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $34.75 | $13.86 | $48.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.09 | $0.00 | $13.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.38 | $0.00 | $12.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.92 | $0.00 | $22.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER, EXCLUDES DRYWALL FINISHING/TAPING | $17.25 | $0.00 | $17.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY ONLY | $18.83 | $9.48 | $28.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $34.87 | $17.79 | $52.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $33.30 | $14.98 | $48.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 | $23.46 | $8.35 | $31.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $16.77 | $5.66 | $22.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $26.71 | $11.93 | $38.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $21.08 | $5.79 | $26.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |