POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 436 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE is $17.78/hr, with the middle 80% of counties paying between $14.20 and $78.58/hr. The highest state average is New York at $92.81/hr; the lowest is Louisiana at $13.83/hr.

Bottom 10%
$14.20
Median
$17.78
Average
$38.50
Top 10%
$78.58

Range: $13.09 – $97.63/hr across 15 states. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$17.78/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-37%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Delaware DE
Avg base: $45.81/hr
Avg total: $77.19/hr
1 rate
Iowa IA
Avg base: $39.83/hr
Avg total: $65.82/hr
6 rates
Idaho ID
Avg base: $36.14/hr
Avg total: $52.24/hr
12 rates
Indiana IN
Avg base: $46.02/hr
Avg total: $81.20/hr
47 rates
Kansas KS
Avg base: $42.21/hr
Avg total: $64.07/hr
11 rates
Kentucky KY
Avg base: $43.64/hr
Avg total: $60.51/hr
7 rates
Louisiana LA
Avg base: $13.83/hr
Avg total: $13.83/hr
48 rates
Missouri MO
Avg base: $41.22/hr
Avg total: $70.98/hr
37 rates
North Dakota ND
Avg base: $34.86/hr
Avg total: $57.31/hr
37 rates
New Mexico NM
Avg base: $17.42/hr
Avg total: $17.71/hr
94 rates
New York NY
Avg base: $56.85/hr
Avg total: $92.81/hr
11 rates
Ohio OH
Avg base: $44.57/hr
Avg total: $60.98/hr
7 rates
Pennsylvania PA
Avg base: $44.61/hr
Avg total: $75.44/hr
5 rates
South Carolina SC
Avg base: $16.02/hr
Avg total: $16.02/hr
112 rates
Virginia VA
Avg base: $36.31/hr
Avg total: $49.58/hr
1 rate

All Rates

436 county-level rates for POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
New Castle DE highway $45.81 $31.38 $77.19 WD →
Benton IA building $39.00 $18.35 $57.35 WD →
Dubuque IA building $39.00 $18.35 $57.35 WD →
Jones IA building $39.00 $18.35 $57.35 WD →
Lee IA building $41.50 $41.25 $82.75 WD →
Linn IA building $39.00 $18.35 $57.35 WD →
Scott IA building $41.50 $41.25 $82.75 WD →
Ada ID heavy $36.14 $16.10 $52.24 WD →
Bannock ID heavy $36.14 $16.10 $52.24 WD →
Boise ID heavy $36.14 $16.10 $52.24 WD →
Bonneville ID heavy $36.14 $16.10 $52.24 WD →
Butte ID heavy $36.14 $16.10 $52.24 WD →
Canyon ID heavy $36.14 $16.10 $52.24 WD →
Franklin ID heavy $36.14 $16.10 $52.24 WD →
Gem ID heavy $36.14 $16.10 $52.24 WD →
Jefferson ID heavy $36.14 $16.10 $52.24 WD →
Kootenai ID heavy $36.14 $16.10 $52.24 WD →
Nez Perce ID heavy $36.14 $16.10 $52.24 WD →
Owyhee ID heavy $36.14 $16.10 $52.24 WD →
Allen IN residential $49.05 $43.40 $92.45 WD →
Bartholomew IN residential $40.15 $19.25 $59.40 WD →
Benton IN residential $49.05 $43.40 $92.45 WD →
Boone IN residential $40.15 $19.25 $59.40 WD →
Brown IN residential $40.15 $19.25 $59.40 WD →
Carroll IN residential $49.05 $43.40 $92.45 WD →
Clark IN residential $49.05 $43.40 $92.45 WD →
Clay IN residential $49.05 $43.40 $92.45 WD →
Dearborn IN residential $40.15 $19.25 $59.40 WD →
Delaware IN residential $40.15 $19.25 $59.40 WD →
Elkhart IN residential $49.05 $43.40 $92.45 WD →
Floyd IN residential $49.05 $43.40 $92.45 WD →
Franklin IN residential $40.15 $19.25 $59.40 WD →
Gibson IN residential $49.05 $43.40 $92.45 WD →
Greene IN residential $49.05 $43.40 $92.45 WD →
Hamilton IN residential $40.15 $19.25 $59.40 WD →
Hancock IN residential $40.15 $19.25 $59.40 WD →
Harrison IN residential $49.05 $43.40 $92.45 WD →
Hendricks IN residential $40.15 $19.25 $59.40 WD →
Howard IN residential $49.05 $43.40 $92.45 WD →
Jasper IN residential $49.05 $43.40 $92.45 WD →
Johnson IN residential $40.15 $19.25 $59.40 WD →
La Porte IN residential $49.05 $43.40 $92.45 WD →
Lake IN residential $49.05 $43.40 $92.45 WD →
Madison IN residential $40.15 $19.25 $59.40 WD →
Marion IN residential $40.15 $19.25 $59.40 WD →
Monroe IN residential $49.05 $43.40 $92.45 WD →
Morgan IN residential $40.15 $19.25 $59.40 WD →
Newton IN residential $49.05 $43.40 $92.45 WD →
Ohio IN residential $40.15 $19.25 $59.40 WD →
Owen IN residential $49.05 $43.40 $92.45 WD →
Porter IN residential $49.05 $43.40 $92.45 WD →
Posey IN residential $49.05 $43.40 $92.45 WD →
Putnam IN residential $40.15 $19.25 $59.40 WD →
Shelby IN residential $40.15 $19.25 $59.40 WD →
St Joseph IN residential $49.05 $43.40 $92.45 WD →
St Joseph IN residential $49.05 $43.40 $92.45 WD →
Sullivan IN residential $49.05 $43.40 $92.45 WD →
Tippecanoe IN residential $49.05 $43.40 $92.45 WD →
Tipton IN residential $49.05 $43.40 $92.45 WD →
Vanderburgh IN residential $49.05 $43.40 $92.45 WD →
Vermillion IN residential $49.05 $43.40 $92.45 WD →
Vigo IN residential $49.05 $43.40 $92.45 WD →
Warrick IN residential $49.05 $43.40 $92.45 WD →
Washington IN residential $49.05 $43.40 $92.45 WD →
Wells IN residential $49.05 $43.40 $92.45 WD →
Whitley IN residential $49.05 $43.40 $92.45 WD →
Douglas KS heavy $36.09 $16.83 $52.92 WD →
Franklin KS building $45.48 $22.42 $67.90 WD →
Franklin KS heavy $40.17 $22.29 $62.46 WD →
Johnson KS highway $40.17 $22.29 $62.46 WD →
Johnson KS building $45.48 $22.42 $67.90 WD →
Johnson KS heavy $40.17 $22.29 $62.46 WD →
Linn KS heavy $40.17 $22.29 $62.46 WD →
Linn KS building $45.48 $22.42 $67.90 WD →
Miami KS building $45.48 $22.42 $67.90 WD →
Miami KS heavy $40.17 $22.29 $62.46 WD →
Wyandotte KS building $45.48 $22.42 $67.90 WD →
Boone KY heavy $44.14 $16.41 $60.55 WD →
Campbell KY heavy $44.14 $16.41 $60.55 WD →
Gallatin KY heavy $44.14 $16.41 $60.55 WD →
Grant KY heavy $44.14 $16.41 $60.55 WD →
Kenton KY heavy $44.14 $16.41 $60.55 WD →
Marshall KY building $40.65 $19.60 $60.25 WD →
Pendleton KY heavy $44.14 $16.41 $60.55 WD →
Acadia LA highway $13.09 $0.00 $13.09 WD →
Acadia LA highway $14.15 $0.00 $14.15 WD →
Acadia LA highway $14.24 $0.00 $14.24 WD →
Allen LA highway $14.15 $0.00 $14.15 WD →
Allen LA highway $13.09 $0.00 $13.09 WD →
Allen LA highway $14.24 $0.00 $14.24 WD →
Assumption LA highway $14.24 $0.00 $14.24 WD →
Assumption LA highway $13.09 $0.00 $13.09 WD →
Assumption LA highway $14.15 $0.00 $14.15 WD →
Avoyelles LA highway $14.15 $0.00 $14.15 WD →
Avoyelles LA highway $13.09 $0.00 $13.09 WD →
Avoyelles LA highway $14.24 $0.00 $14.24 WD →
Beauregard LA highway $14.24 $0.00 $14.24 WD →
Beauregard LA highway $13.09 $0.00 $13.09 WD →
Beauregard LA highway $14.15 $0.00 $14.15 WD →
Evangeline LA highway $14.24 $0.00 $14.24 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE →