Wage Determination IA20260078-15108-bld
Jones, IA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination IA20260078-15108-bld covers 29 trade classifications for building construction in Jones, IA. Total packages (base + fringe) range from $22.43/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: IA20260078-15108-bld
Revision: 1
Type: building
County: Jones
State: IA
Effective: May 17, 2026
Trades covered: 29
Highest rate: $94.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.48 | $33.91 | $82.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $36.00 | $17.79 | $53.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.17 | $24.15 | $55.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $21.66 | $2.47 | $24.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICAL INSTALLER | $24.04 | $8.68 | $32.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $28.70 | $10.85 | $39.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: FLOOR COATING/EPOXY | $22.43 | $0.00 | $22.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.33 | $19.82 | $48.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $28.33 | $19.82 | $48.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $36.70 | $28.95 | $65.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $29.55 | $12.10 | $41.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $29.55 | $12.10 | $41.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $45.51 | $21.57 | $67.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $45.51 | $21.57 | $67.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.00 | $18.35 | $57.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER, ROLLER..$ 35.29 18.35 POWER EQUIPMENT OPERATOR: LOADER | $37.62 | $18.35 | $55.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $21.92 | $5.07 | $26.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $41.45 | $23.11 | $64.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.99 | $26.42 | $72.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $36.00 | $17.79 | $53.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | $0.00 | $0.00 | $0.00 | $0.00 |