OPERATOR: Power Equipment GROUP 2 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: Power Equipment GROUP 2s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 450 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: Power Equipment GROUP 2 is $69.18/hr, with the middle 80% of counties paying between $56.05 and $107.10/hr. The highest state average is Illinois at $76.26/hr; the lowest is Minnesota at $53.16/hr.

Bottom 10%
$56.05
Median
$69.18
Average
$73.44
Top 10%
$107.10

Range: $48.83 – $114.50/hr across 4 states. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $46.08/hr
Avg total: $71.33/hr
15 rates
Illinois IL
Avg base: $40.46/hr
Avg total: $76.26/hr
303 rates
Michigan MI
Avg base: $45.54/hr
Avg total: $70.80/hr
105 rates
Minnesota MN
Avg base: $36.20/hr
Avg total: $53.16/hr
27 rates

All Rates

450 county-level rates for OPERATOR: Power Equipment GROUP 2, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Fresno CA residential $46.08 $25.25 $71.33 WD →
Imperial CA residential $46.08 $25.25 $71.33 WD →
Kern CA residential $46.08 $25.25 $71.33 WD →
Los Angeles CA residential $46.08 $25.25 $71.33 WD →
Madera CA residential $46.08 $25.25 $71.33 WD →
Merced CA residential $46.08 $25.25 $71.33 WD →
Orange CA residential $46.08 $25.25 $71.33 WD →
Riverside CA residential $46.08 $25.25 $71.33 WD →
San Bernardino CA residential $46.08 $25.25 $71.33 WD →
San Joaquin CA residential $46.08 $25.25 $71.33 WD →
San Luis Obispo CA residential $46.08 $25.25 $71.33 WD →
Santa Barbara CA residential $46.08 $25.25 $71.33 WD →
Stanislaus CA residential $46.08 $25.25 $71.33 WD →
Tulare CA residential $46.08 $25.25 $71.33 WD →
Ventura CA residential $46.08 $25.25 $71.33 WD →
Adams IL heavy $30.05 $26.00 $56.05 WD →
Adams IL building $56.05 $51.05 $107.10 WD →
Adams IL highway $30.05 $26.00 $56.05 WD →
Adams IL building $41.50 $41.25 $82.75 WD →
Alexander IL building $30.05 $26.00 $56.05 WD →
Alexander IL heavy $30.05 $26.00 $56.05 WD →
Alexander IL highway $30.05 $26.00 $56.05 WD →
Bond IL building $56.05 $51.05 $107.10 WD →
Bond IL building $41.50 $41.25 $82.75 WD →
Boone IL building $41.50 $41.25 $82.75 WD →
Boone IL building $56.05 $51.05 $107.10 WD →
Boone IL heavy $62.45 $51.00 $113.45 WD →
Boone IL residential $56.05 $51.05 $107.10 WD →
Boone IL highway $62.45 $51.00 $113.45 WD →
Brown IL building $41.50 $41.25 $82.75 WD →
Brown IL heavy $30.05 $26.00 $56.05 WD →
Brown IL building $56.05 $51.05 $107.10 WD →
Brown IL highway $30.05 $26.00 $56.05 WD →
Bureau IL building $41.50 $41.25 $82.75 WD →
Bureau IL building $56.05 $51.05 $107.10 WD →
Calhoun IL building $56.05 $51.05 $107.10 WD →
Calhoun IL building $41.50 $41.25 $82.75 WD →
Carroll IL building $56.05 $51.05 $107.10 WD →
Carroll IL building $41.50 $41.25 $82.75 WD →
Cass IL building $41.50 $41.25 $82.75 WD →
Cass IL building $56.05 $51.05 $107.10 WD →
Cass IL highway $30.05 $26.00 $56.05 WD →
Cass IL heavy $30.05 $26.00 $56.05 WD →
Champaign IL building $30.05 $26.00 $56.05 WD →
Champaign IL highway $30.05 $26.00 $56.05 WD →
Champaign IL residential $30.05 $26.00 $56.05 WD →
Champaign IL heavy $30.05 $26.00 $56.05 WD →
Christian IL building $30.05 $26.00 $56.05 WD →
Christian IL heavy $30.05 $26.00 $56.05 WD →
Christian IL highway $30.05 $26.00 $56.05 WD →
Clark IL heavy $30.05 $26.00 $56.05 WD →
Clark IL building $30.05 $26.00 $56.05 WD →
Clark IL highway $30.05 $26.00 $56.05 WD →
Clay IL building $30.05 $26.00 $56.05 WD →
Clay IL heavy $30.05 $26.00 $56.05 WD →
Clay IL highway $30.05 $26.00 $56.05 WD →
Clinton IL building $56.05 $51.05 $107.10 WD →
Clinton IL building $41.50 $41.25 $82.75 WD →
Coles IL heavy $30.05 $26.00 $56.05 WD →
Coles IL building $30.05 $26.00 $56.05 WD →
Coles IL highway $30.05 $26.00 $56.05 WD →
Cook IL building $63.50 $51.00 $114.50 WD →
Cook IL building $62.45 $51.00 $113.45 WD →
Cook IL heavy $62.45 $51.00 $113.45 WD →
Cook IL residential $63.50 $51.00 $114.50 WD →
Cook IL heavy $63.50 $51.00 $114.50 WD →
Cook IL highway $62.45 $51.00 $113.45 WD →
Cook IL highway $63.50 $51.00 $114.50 WD →
Cook IL residential $62.45 $51.00 $113.45 WD →
Crawford IL heavy $30.05 $26.00 $56.05 WD →
Crawford IL building $30.05 $26.00 $56.05 WD →
Crawford IL highway $30.05 $26.00 $56.05 WD →
Cumberland IL building $30.05 $26.00 $56.05 WD →
Cumberland IL highway $30.05 $26.00 $56.05 WD →
Cumberland IL heavy $30.05 $26.00 $56.05 WD →
De Kalb IL residential $56.05 $51.05 $107.10 WD →
De Kalb IL heavy $62.45 $51.00 $113.45 WD →
De Kalb IL highway $62.45 $51.00 $113.45 WD →
De Kalb IL building $41.50 $41.25 $82.75 WD →
De Kalb IL building $56.05 $51.05 $107.10 WD →
De Witt IL heavy $30.05 $26.00 $56.05 WD →
De Witt IL building $30.05 $26.00 $56.05 WD →
De Witt IL highway $30.05 $26.00 $56.05 WD →
Douglas IL building $30.05 $26.00 $56.05 WD →
Douglas IL heavy $30.05 $26.00 $56.05 WD →
Douglas IL highway $30.05 $26.00 $56.05 WD →
Du Page IL residential $63.50 $51.00 $114.50 WD →
Du Page IL highway $62.45 $51.00 $113.45 WD →
Du Page IL heavy $62.45 $51.00 $113.45 WD →
Du Page IL building $63.50 $51.00 $114.50 WD →
Edgar IL building $30.05 $26.00 $56.05 WD →
Edgar IL heavy $30.05 $26.00 $56.05 WD →
Edgar IL highway $30.05 $26.00 $56.05 WD →
Edwards IL building $30.05 $26.00 $56.05 WD →
Edwards IL highway $30.05 $26.00 $56.05 WD →
Edwards IL heavy $30.05 $26.00 $56.05 WD →
Effingham IL building $30.05 $26.00 $56.05 WD →
Effingham IL highway $30.05 $26.00 $56.05 WD →
Effingham IL heavy $30.05 $26.00 $56.05 WD →
Fayette IL building $30.05 $26.00 $56.05 WD →
Top-paying counties for OPERATOR: Power Equipment GROUP 2 →