OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTIONs across all covered states and counties. Rates vary by location and construction type.
Across 11 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION is $13.61/hr, with the middle 80% of counties paying between $13.61 and $13.61/hr. The highest state average is Utah at $13.61/hr; the lowest is Utah at $13.61/hr.
Range: $13.61 – $13.61/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
11 county-level rates for OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Beaver | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Emery | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Garfield | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Grand | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Iron | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Kane | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Millard | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Piute | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| San Juan | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Sevier | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |
| Wayne | UT | heavy | $13.61 | $0.00 | $13.61 | WD → |