Wage Determination UT20260028-17682-hvy

Garfield, UT · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination UT20260028-17682-hvy covers 20 trade classifications for heavy construction in Garfield, UT. Total packages (base + fringe) range from $9.00/hr to $57.46/hr, with the highest going to PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: UT20260028-17682-hvy
Revision: 1
Type: heavy
County: Garfield
State: UT
Effective: May 17, 2026
Trades covered: 20
Highest rate: $57.46/hr
Official source: SAM.gov reference UT20260028View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.75 $3.03 $17.78 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.00 $0.56 $14.56 $0.00 $0.00 $0.00 $0.00
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 $0.00 $0.00 $0.00 $0.00
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 $0.00 $0.00 $0.00 $0.00
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY $21.65 $8.65 $30.30 $0.00 $0.00 $0.00 $0.00
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.92 $0.00 $10.92 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.00 $0.36 $9.36 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.00 $0.00 $9.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.67 $0.00 $12.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION $13.61 $0.00 $13.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.38 $0.00 $11.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.89 $0.00 $10.89 $0.00 $0.00 $0.00 $0.00
PASS, SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO T $40.66 $15.75 $56.41 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $41.06 $15.75 $56.81 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $41.71 $15.75 $57.46 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Garfield → Revision history →