OPERATOR: CONCRETE BATCH PLANT — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: CONCRETE BATCH PLANTs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 31 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: CONCRETE BATCH PLANT is $36.90/hr, with the middle 80% of counties paying between $36.90 and $36.90/hr. The highest state average is Idaho at $36.90/hr; the lowest is Idaho at $36.90/hr.

Bottom 10%
$36.90
Median
$36.90
Average
$36.90
Top 10%
$36.90

Range: $36.90 – $36.90/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Idaho ID
Avg base: $24.94/hr
Avg total: $36.90/hr
31 rates

All Rates

31 county-level rates for OPERATOR: CONCRETE BATCH PLANT, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams ID heavy $24.94 $11.96 $36.90 WD →
Bear Lake ID heavy $24.94 $11.96 $36.90 WD →
Benewah ID heavy $24.94 $11.96 $36.90 WD →
Bingham ID heavy $24.94 $11.96 $36.90 WD →
Blaine ID heavy $24.94 $11.96 $36.90 WD →
Bonner ID heavy $24.94 $11.96 $36.90 WD →
Boundary ID heavy $24.94 $11.96 $36.90 WD →
Camas ID heavy $24.94 $11.96 $36.90 WD →
Caribou ID heavy $24.94 $11.96 $36.90 WD →
Cassia ID heavy $24.94 $11.96 $36.90 WD →
Clark ID heavy $24.94 $11.96 $36.90 WD →
Clearwater ID heavy $24.94 $11.96 $36.90 WD →
Custer ID heavy $24.94 $11.96 $36.90 WD →
Elmore ID heavy $24.94 $11.96 $36.90 WD →
Fremont ID heavy $24.94 $11.96 $36.90 WD →
Gooding ID heavy $24.94 $11.96 $36.90 WD →
Idaho ID heavy $24.94 $11.96 $36.90 WD →
Jerome ID heavy $24.94 $11.96 $36.90 WD →
Latah ID heavy $24.94 $11.96 $36.90 WD →
Lemhi ID heavy $24.94 $11.96 $36.90 WD →
Lewis ID heavy $24.94 $11.96 $36.90 WD →
Lincoln ID heavy $24.94 $11.96 $36.90 WD →
Madison ID heavy $24.94 $11.96 $36.90 WD →
Minidoka ID heavy $24.94 $11.96 $36.90 WD →
Oneida ID heavy $24.94 $11.96 $36.90 WD →
Payette ID heavy $24.94 $11.96 $36.90 WD →
Shoshone ID heavy $24.94 $11.96 $36.90 WD →
Teton ID heavy $24.94 $11.96 $36.90 WD →
Twin Falls ID heavy $24.94 $11.96 $36.90 WD →
Valley ID heavy $24.94 $11.96 $36.90 WD →
Washington ID heavy $24.94 $11.96 $36.90 WD →
Top-paying counties for OPERATOR: CONCRETE BATCH PLANT →