Wage Determination ID20260048-17214-hvy

Elmore, ID · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination ID20260048-17214-hvy covers 29 trade classifications for heavy construction in Elmore, ID. Total packages (base + fringe) range from $20.97/hr to $61.09/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ID20260048-17214-hvy
Revision: 1
Type: heavy
County: Elmore
State: ID
Effective: May 17, 2026
Trades covered: 29
Highest rate: $61.09/hr
Official source: SAM.gov reference ID20260048View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
200 FT $.30 OVER SCALE OVER 200 FT POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES, DRILLING, FRONT END LOADER, OILER, SCRAPER ZONE PAY: ZON $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
CARPENTER $25.27 $9.79 $35.06 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $26.77 $10.15 $36.92 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.25 $12.31 $35.56 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.25 $18.84 $61.09 $0.00 $0.00 $0.00 $0.00
FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE $37.58 $16.10 $53.68 $0.00 $0.00 $0.00 $0.00
FT $.30 OVER SCALE OVER 200 FT POWER EQUIPMENT OPERATOR: GROUP 70 CRANES, DRILL, GRADER, FRONT END LOADER, HEAVY DUTY MECHANIC, SCRAPERS, TOWER CRANE $37.35 $16.10 $53.45 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.22 $16.70 $43.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.37 $22.98 $56.35 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.46 $10.00 $32.46 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 FLAGGER $33.63 $16.50 $50.13 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 $16.50 $50.33 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.67 $7.26 $24.93 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $36.81 $16.10 $52.91 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.58 $0.00 $21.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.97 $0.00 $20.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE BATCH PLANT $24.94 $11.96 $36.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.20 $0.00 $21.20 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE $36.33 $16.10 $52.43 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $36.64 $16.10 $52.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5A DUMP $35.60 $17.00 $52.60 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5B DUMP $35.78 $17.00 $52.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5C DUMP $36.01 $17.00 $53.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5D DUMP $36.12 $17.00 $53.12 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5E DUMP $36.75 $17.00 $53.75 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5F DUMP $37.19 $17.00 $54.19 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.00 $12.10 $33.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.70 $12.10 $36.80 $0.00 $0.00 $0.00 $0.00
View all WDs for Elmore → Revision history →