Wage Determination ID20260045-17211-hvy

Cassia, ID · heavy · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination ID20260045-17211-hvy covers 25 trade classifications for heavy construction in Cassia, ID. Total packages (base + fringe) range from $16.39/hr to $58.74/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ID20260045-17211-hvy
Revision: 2
Type: heavy
County: Cassia
State: ID
Effective: May 17, 2026
Trades covered: 25
Highest rate: $58.74/hr
Official source: SAM.gov reference ID20260045View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $28.00 $0.00 $28.00 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $28.00 $0.00 $28.00 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.16 $5.67 $22.83 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $18.74 $58.74 $0.00 $0.00 $0.00 $0.00
FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE $37.58 $16.10 $53.68 $0.00 $0.00 $0.00 $0.00
FT $.30 OVER SCALE OVER 200 FT POWER EQUIPMENT OPERATOR: GROUP 7: DRILL, HEAVY DUTY MECHANIC, SCRAPERS ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.22 $16.70 $43.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.37 $22.98 $56.35 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.13 $11.98 $34.11 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 FLAGGER $33.63 $16.50 $50.13 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 $16.50 $50.33 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.39 $0.00 $16.39 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.06 $0.00 $21.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.00 $0.00 $17.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE BATCH PLANT $24.94 $11.96 $36.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.59 $9.60 $37.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.98 $0.00 $21.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.17 $9.44 $34.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.33 $4.25 $25.58 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER AND SPRAY $17.06 $0.65 $17.71 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE $36.33 $16.10 $52.43 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.11 $0.00 $17.11 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.00 $12.10 $33.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.89 $9.52 $33.41 $0.00 $0.00 $0.00 $0.00
View all WDs for Cassia → Revision history →