HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE — Prevailing Wage Rates
Davis-Bacon prevailing wages for HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDEs across all covered states and counties. Rates vary by location and construction type.
Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE is $78.81/hr, with the middle 80% of counties paying between $76.31 and $81.31/hr. The highest state average is Massachusetts at $78.81/hr; the lowest is Massachusetts at $78.81/hr.
Range: $76.31 – $81.31/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
20 county-level rates for HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Berkshire | MA | building | $50.73 | $30.58 | $81.31 | WD → |
| Berkshire | MA | building | $49.23 | $30.58 | $79.81 | WD → |
| Berkshire | MA | building | $48.23 | $30.58 | $78.81 | WD → |
| Berkshire | MA | building | $47.23 | $30.58 | $77.81 | WD → |
| Berkshire | MA | building | $45.73 | $30.58 | $76.31 | WD → |
| Franklin | MA | building | $50.73 | $30.58 | $81.31 | WD → |
| Franklin | MA | building | $49.23 | $30.58 | $79.81 | WD → |
| Franklin | MA | building | $48.23 | $30.58 | $78.81 | WD → |
| Franklin | MA | building | $47.23 | $30.58 | $77.81 | WD → |
| Franklin | MA | building | $45.73 | $30.58 | $76.31 | WD → |
| Hampden | MA | building | $50.73 | $30.58 | $81.31 | WD → |
| Hampden | MA | building | $49.23 | $30.58 | $79.81 | WD → |
| Hampden | MA | building | $48.23 | $30.58 | $78.81 | WD → |
| Hampden | MA | building | $47.23 | $30.58 | $77.81 | WD → |
| Hampden | MA | building | $45.73 | $30.58 | $76.31 | WD → |
| Hampshire | MA | building | $50.73 | $30.58 | $81.31 | WD → |
| Hampshire | MA | building | $49.23 | $30.58 | $79.81 | WD → |
| Hampshire | MA | building | $48.23 | $30.58 | $78.81 | WD → |
| Hampshire | MA | building | $47.23 | $30.58 | $77.81 | WD → |
| Hampshire | MA | building | $45.73 | $30.58 | $76.31 | WD → |