$2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLU
|
$44.73 |
$30.58 |
$75.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$50.62 |
$28.82 |
$79.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S
|
$36.35 |
$30.58 |
$66.93 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
|
$50.81 |
$32.27 |
$83.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
|
$50.81 |
$32.27 |
$83.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CABLEWAYS; SHAFT HOISTS; MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE PAVERS; TRENCHING MACHIN
|
$41.23 |
$30.58 |
$71.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$43.33 |
$27.82 |
$71.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER (FRANKLIN COUNTY)
|
$43.33 |
$27.82 |
$71.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER/LATHER/DRYWALL APPLICATOR (HAMPDEN; HAMPSHIRE AND FRANKLIN)
|
$43.33 |
$27.82 |
$71.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE OF COMPACTORS INCLUDING MACHINES FOR P
|
$37.47 |
$30.58 |
$68.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
COMPRESSOR HOUSE; ROCK AND EARTH BORING MACHINES; FRONT END LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT LIFT AND OVER 3 TON CAPACITY; SCRAPER 21
|
$40.92 |
$30.58 |
$71.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CU FT; PUMPS 4 INCHES TO 16 INCHES. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON
|
$34.41 |
$30.58 |
$64.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y
|
$41.14 |
$37.35 |
$78.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y
|
$41.02 |
$37.35 |
$78.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE)
|
$52.16 |
$29.56 |
$81.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (HAMPDEN; HAMPSHIRE)
|
$52.16 |
$29.56 |
$81.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA
|
$66.41 |
$38.44 |
$104.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FLOOR LAYER: CARPET
|
$43.23 |
$27.79 |
$71.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS D
|
$42.72 |
$30.58 |
$73.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER FOOTNOTE: A. PAID HOLIDAY: LABOR DAY (PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE WEEK PRIOR TO LABOR DAY AND ANY PART OF THE WEEK AFTER LABO
|
$43.13 |
$21.00 |
$64.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE
|
$50.73 |
$30.58 |
$81.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE
|
$49.23 |
$30.58 |
$79.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE
|
$48.23 |
$30.58 |
$78.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE
|
$47.23 |
$30.58 |
$77.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDE
|
$45.73 |
$30.58 |
$76.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
INSULATOR/ASBESTOS WORKER
|
$44.36 |
$36.63 |
$80.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (BERKSHIRE)
|
$40.75 |
$31.91 |
$72.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE)
|
$41.89 |
$33.90 |
$75.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: STRUCTURAL, ORNAMENTAL, REINFORCING, FENCE ERECTOR, MACHINERY MOVER, RIGGER, RODMAN, STONE DERRICKMAN (BERKSHIRE)..$ 40.75 31.91 IRONWORK
|
$41.00 |
$31.91 |
$72.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: (BERKSHIRE COUNTY, FRANKLIN COUNTY, HAMPSHIRE COUNTY)
|
$31.54 |
$25.63 |
$57.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 LABORERS, CARPENTER TENDERS, WRECKING LABORERS (HAMPDEN COUNTY, HAMPSHIRE COUNTY FRANKLIN COUNTY)
|
$35.00 |
$28.87 |
$63.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS (FRANKLIN)
|
$38.95 |
$29.70 |
$68.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL
|
$39.20 |
$29.70 |
$68.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 ASPHALT RAKERS, CARBIDE CORE DRILLER OPERATORS, CHAIN SAW OPERATORS, PIPELAYERS, JACKHAMMER AND PAVING BREAKER OPERATORS, BARCO TYPE
|
$35.25 |
$28.87 |
$64.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (FRANKLIN)
|
$39.70 |
$29.70 |
$69.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3 PRECAST FLOOR AND ROOF PLANK ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS, HAZ-MAT LABORERS (HAMPDEN COUNTY, HAMPSHIRE COUNTY
|
$35.75 |
$28.87 |
$64.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4 AIR TRACK OPERATORS, BLOCK PAVERS, RAMMERS AND CURB SETTERS, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (HAMPDEN COUNTY, HAMPSHIRE CO
|
$35.75 |
$28.87 |
$64.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4 BLASTER; POWDERMAN (FRANKLIN)
|
$39.95 |
$29.70 |
$69.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 5 POWDERMAN AND BLASTER (HAMPDEN COUNTY, HAMPSHIRE COUNTY FRANKLIN COUNTY)
|
$36.00 |
$28.87 |
$64.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 5 PRECAST FLOOR AND ROOF, PLANK ERECTOR (FRANKLIN)
|
$39.70 |
$29.70 |
$69.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN)
|
$40.95 |
$29.70 |
$70.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR
|
$42.26 |
$22.56 |
$64.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN, CABLE SPLICER AND DYNAMITE MAN
|
$46.96 |
$25.05 |
$72.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: MATERIAL MAN, TRACTOR TRAILER DRIVER, EQUIPMENT OPERATOR
|
$39.92 |
$21.80 |
$61.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE FINISHER
|
$28.43 |
$25.85 |
$54.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$43.42 |
$33.00 |
$76.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER REPAINT: BRUSH, TAPER
|
$35.40 |
$31.95 |
$67.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER REPAINT: SPRAY, SANDBLAST
|
$36.80 |
$31.95 |
$68.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH, TAPER
|
$38.08 |
$31.95 |
$70.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY, SANDBLAST
|
$39.48 |
$31.95 |
$71.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$55.79 |
$35.47 |
$91.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER AND STEAMFITTER (BERKSHIRE; FRANKLIN)
|
$52.26 |
$31.05 |
$83.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER AND STEAMFITTER (FRANKLIN)
|
$55.00 |
$31.57 |
$86.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE)
|
$52.26 |
$31.05 |
$83.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D
|
$42.41 |
$30.58 |
$72.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: COMPOSITION ROOFERS & DAMP WATERPROOFERS ALL TEAR-OFF AND/OR REMOVAL, AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL ARE
|
$42.48 |
$30.14 |
$72.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: PITCH,SLATE, TILE AND PRECAST CONCRETE ALL TEAR-OFF AND/OR REMOVAL, AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS
|
$42.48 |
$30.14 |
$72.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$43.48 |
$36.46 |
$79.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOY
|
$64.85 |
$40.76 |
$105.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TELEDATA SYSTEM INSTALLER
|
$52.16 |
$29.56 |
$81.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA
|
$40.78 |
$37.35 |
$78.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS
|
$40.95 |
$37.35 |
$78.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTO
|
$41.24 |
$37.35 |
$78.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA
|
$41.53 |
$37.35 |
$78.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATE
|
$41.82 |
$37.35 |
$79.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER
|
$52.73 |
$30.58 |
$83.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
YD; SCRAPERS UP TO 21 CU YD; TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE BOILER; SELF-LOADING BATCH PL
|
$40.70 |
$30.58 |
$71.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |