FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE — Prevailing Wage Rates
Davis-Bacon prevailing wages for FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDEs across all covered states and counties. Rates vary by location and construction type.
Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE is $40.64/hr, with the middle 80% of counties paying between $40.64 and $40.64/hr. The highest state average is District of Columbia at $40.64/hr; the lowest is District of Columbia at $40.64/hr.
Range: $40.64 – $40.64/hr across 3 states. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
16 county-level rates for FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Washington, D.C. | DC | building | $30.21 | $10.43 | $40.64 | WD → |
| Arlington | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Clarke | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Culpeper | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Fairfax | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Fauquier | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Frederick | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Loudoun | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Prince William | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Rappahannock | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Spotsylvania | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Stafford | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Warren | VA | building | $30.21 | $10.43 | $40.64 | WD → |
| Berkeley | WV | building | $30.21 | $10.43 | $40.64 | WD → |
| Hardy | WV | building | $30.21 | $10.43 | $40.64 | WD → |
| Jefferson | WV | building | $30.21 | $10.43 | $40.64 | WD → |