Wage Determination VA20260178-16464-bld

Fairfax, VA · building · Rev. 3 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination VA20260178-16464-bld covers 35 trade classifications for building construction in Fairfax, VA. Total packages (base + fringe) range from $18.75/hr to $82.56/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: VA20260178-16464-bld
Revision: 3
Type: building
County: Fairfax
State: VA
Effective: May 17, 2026
Trades covered: 35
Highest rate: $82.56/hr
Official source: SAM.gov reference VA20260178View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $40.77 $20.17 $60.94 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.97 $27.39 $66.36 $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $19.68 $0.00 $19.68 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $23.67 $0.00 $23.67 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $23.34 $5.04 $28.38 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.69 $5.55 $30.24 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $25.53 $7.86 $33.39 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $59.50 $23.06 $82.56 $0.00 $0.00 $0.00 $0.00
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE $30.21 $10.43 $40.64 $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: SOFT FLOORS $18.75 $0.00 $18.75 $0.00 $0.00 $0.00 $0.00
GLAZIER $32.41 $14.46 $46.87 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.88 $23.78 $55.66 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $37.86 $25.86 $63.72 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.86 $25.86 $63.72 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING $15.74 $3.43 $19.17 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.81 $4.26 $21.07 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $28.85 $12.55 $41.40 $0.00 $0.00 $0.00 $0.00
MASON - STONE $45.65 $21.21 $66.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.81 $0.00 $21.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.95 $4.03 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.99 $4.98 $26.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $32.52 $2.64 $35.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.56 $7.57 $29.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.26 $3.57 $25.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.25 $4.88 $21.13 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $29.16 $11.86 $41.02 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL D $55.00 $24.46 $79.46 $0.00 $0.00 $0.00 $0.00
PLUMBER A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND $53.30 $23.71 $77.01 $0.00 $0.00 $0.00 $0.00
ROOFER $21.55 $7.01 $28.56 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LA $53.42 $23.20 $76.62 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.22 $27.69 $72.91 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $23.40 $0.00 $23.40 $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.34 $14.20 $48.54 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.22 $2.58 $21.80 $0.00 $0.00 $0.00 $0.00
WATERPROOFER $21.75 $1.57 $23.32 $0.00 $0.00 $0.00 $0.00
View all WDs for Fairfax → Revision history →