Wage Determination MO20260029-15866-bld

Barry, MO · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260029-15866-bld covers 44 trade classifications for building construction in Barry, MO. Total packages (base + fringe) range from $22.71/hr to $99.13/hr, with the highest going to VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260029-15866-bld
Revision: 1
Type: building
County: Barry
State: MO
Effective: May 17, 2026
Trades covered: 44
Highest rate: $99.13/hr
Official source: SAM.gov reference MO20260029View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.67 $19.48 $53.15 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $31.51 $22.25 $53.76 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $29.50 $21.50 $51.00 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $32.25 $20.81 $53.06 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $51.01 $26.25 $77.26 $0.00 $0.00 $0.00 $0.00
GLAZIER $22.71 $0.00 $22.71 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $28.00 $13.18 $41.18 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.78 $13.62 $43.40 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $26.50 $13.18 $39.68 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $27.05 $13.62 $40.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $23.55 $7.47 $31.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.47 $0.00 $24.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37 $0.00 $0.00 $0.00 $0.00
PAINTER $25.79 $15.35 $41.14 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.39 $17.76 $43.15 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY $37.15 $15.42 $52.57 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $35.75 $15.32 $51.07 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $32.78 $15.32 $48.10 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY $37.15 $15.42 $52.57 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $34.25 $15.32 $49.57 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $31.28 $15.32 $46.60 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $31.62 $18.07 $49.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $14.51 $45.24 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $47.20 $26.28 $73.48 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $34.43 $17.86 $52.29 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
TILE SETTER $26.47 $14.89 $41.36 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS $60.69 $38.44 $99.13 $0.00 $0.00 $0.00 $0.00