COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL — Prevailing Wage Rates

Davis-Bacon prevailing wages for COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TELs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL is $44.28/hr, with the middle 80% of counties paying between $28.22 and $80.55/hr. The highest state average is New York at $51.02/hr; the lowest is New York at $51.02/hr.

Bottom 10%
$28.22
Median
$44.28
Average
$51.02
Top 10%
$80.55

Range: $28.22 – $80.55/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

New York NY
Avg base: $27.20/hr
Avg total: $51.02/hr
6 rates

All Rates

6 county-level rates for COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Erie NY building $44.50 $36.05 $80.55 WD →
Erie NY building $22.90 $21.38 $44.28 WD →
Erie NY building $14.20 $14.02 $28.22 WD →
Wyoming NY highway $44.50 $36.05 $80.55 WD →
Wyoming NY highway $22.90 $21.38 $44.28 WD →
Wyoming NY highway $14.20 $14.02 $28.22 WD →
Top-paying counties for COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL →