CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION — Prevailing Wage Rates

Davis-Bacon prevailing wages for CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATIONs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION is $53.76/hr, with the middle 80% of counties paying between $53.76 and $53.76/hr. The highest state average is Missouri at $53.76/hr; the lowest is Missouri at $53.76/hr.

Bottom 10%
$53.76
Median
$53.76
Average
$53.76
Top 10%
$53.76

Range: $53.76 – $53.76/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031Carpenters.

Davis-Bacon median
$53.76/hr
National median total package (base + fringe)
BLS OEWS market median
$28.51/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+88.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Missouri MO
Avg base: $31.51/hr
Avg total: $53.76/hr
6 rates

All Rates

6 county-level rates for CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Dent MO building $31.51 $22.25 $53.76 WD →
Gasconade MO building $31.51 $22.25 $53.76 WD →
Maries MO building $31.51 $22.25 $53.76 WD →
Miller MO building $31.51 $22.25 $53.76 WD →
Montgomery MO building $31.51 $22.25 $53.76 WD →
Morgan MO building $31.51 $22.25 $53.76 WD →
Top-paying counties for CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION →