CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK — Prevailing Wage Rates

Davis-Bacon prevailing wages for CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORKs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK is $27.64/hr, with the middle 80% of counties paying between $25.72 and $27.64/hr. The highest state average is Montana at $27.69/hr; the lowest is Michigan at $22.73/hr.

Bottom 10%
$25.72
Median
$27.64
Average
$27.28
Top 10%
$27.64

Range: $22.73 – $30.30/hr across 2 states. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031Carpenters.

Davis-Bacon median
$27.64/hr
National median total package (base + fringe)
BLS OEWS market median
$28.51/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-3.1%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Michigan MI
Avg base: $18.14/hr
Avg total: $22.73/hr
1 rate
Montana MT
Avg base: $20.79/hr
Avg total: $27.69/hr
11 rates

All Rates

12 county-level rates for CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Kent MI building $18.14 $4.59 $22.73 WD →
Beaverhead MT building $20.51 $7.13 $27.64 WD →
Broadwater MT building $20.51 $7.13 $27.64 WD →
Deer Lodge MT building $20.51 $7.13 $27.64 WD →
Granite MT building $20.51 $7.13 $27.64 WD →
Jefferson MT building $20.51 $7.13 $27.64 WD →
Lewis And Clark MT building $19.12 $6.39 $25.51 WD →
Madison MT building $25.00 $5.30 $30.30 WD →
Meagher MT building $20.51 $7.13 $27.64 WD →
Park MT building $20.51 $7.13 $27.64 WD →
Powell MT building $20.51 $7.13 $27.64 WD →
Yellowstone National Park MT building $20.51 $7.13 $27.64 WD →
Top-paying counties for CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK →