Wage Determination MT20260040-17832-bld
Lewis And Clark, MT · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260040-17832-bld covers 23 trade classifications for building construction in Lewis And Clark, MT. Total packages (base + fringe) range from $19.18/hr to $106.05/hr, with the highest going to ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260040-17832-bld
Revision: 1
Type: building
County: Lewis And Clark
State: MT
Effective: May 17, 2026
Trades covered: 23
Highest rate: $106.05/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $38.75 | $32.31 | $71.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.55 | $15.75 | $46.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK | $19.12 | $6.39 | $25.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $24.14 | $0.00 | $24.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 | $19.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.42 | $18.05 | $58.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: Low Voltage Wiring for Alarms and Computers | $23.90 | $12.85 | $36.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE | $67.61 | $38.44 | $106.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $17.93 | $2.62 | $20.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT AND FROST INSULATOR | $43.81 | $21.87 | $65.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.83 | $25.30 | $62.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH | $23.05 | $12.72 | $35.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.66 | $5.25 | $22.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.04 | $7.41 | $31.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $22.20 | $6.75 | $28.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $21.44 | $8.05 | $29.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $19.18 | $0.00 | $19.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | $66.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | $66.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.48 | $5.28 | $20.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.00 | $22.07 | $62.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $39.97 | $24.40 | $64.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $19.36 | $5.37 | $24.73 | $0.00 | $0.00 | $0.00 | $0.00 |