Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming — Prevailing Wage Rates
Davis-Bacon prevailing wages for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuumings across all covered states and counties. Rates vary by location and construction type.
Across 22 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming is $63.54/hr, with the middle 80% of counties paying between $63.54 and $63.54/hr. The highest state average is New York at $63.54/hr; the lowest is New York at $63.54/hr.
Range: $63.54 – $63.54/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
22 county-level rates for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Broome | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Broome | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Broome | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Cayuga | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Cayuga | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Chemung | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Chemung | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Chemung | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Chenango | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Chenango | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Chenango | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Herkimer | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Herkimer | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Herkimer | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Otsego | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Otsego | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Schuyler | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Schuyler | NY | highway | $38.50 | $25.04 | $63.54 | WD → |
| Schuyler | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Tioga | NY | heavy | $38.50 | $25.04 | $63.54 | WD → |
| Tioga | NY | building | $38.50 | $25.04 | $63.54 | WD → |
| Tioga | NY | highway | $38.50 | $25.04 | $63.54 | WD → |