Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming — Prevailing Wage Rates

Davis-Bacon prevailing wages for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuumings across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 22 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming is $63.54/hr, with the middle 80% of counties paying between $63.54 and $63.54/hr. The highest state average is New York at $63.54/hr; the lowest is New York at $63.54/hr.

Bottom 10%
$63.54
Median
$63.54
Average
$63.54
Top 10%
$63.54

Range: $63.54 – $63.54/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

New York NY
Avg base: $38.50/hr
Avg total: $63.54/hr
22 rates

All Rates

22 county-level rates for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Broome NY building $38.50 $25.04 $63.54 WD →
Broome NY highway $38.50 $25.04 $63.54 WD →
Broome NY heavy $38.50 $25.04 $63.54 WD →
Cayuga NY heavy $38.50 $25.04 $63.54 WD →
Cayuga NY highway $38.50 $25.04 $63.54 WD →
Chemung NY highway $38.50 $25.04 $63.54 WD →
Chemung NY building $38.50 $25.04 $63.54 WD →
Chemung NY heavy $38.50 $25.04 $63.54 WD →
Chenango NY heavy $38.50 $25.04 $63.54 WD →
Chenango NY highway $38.50 $25.04 $63.54 WD →
Chenango NY building $38.50 $25.04 $63.54 WD →
Herkimer NY building $38.50 $25.04 $63.54 WD →
Herkimer NY highway $38.50 $25.04 $63.54 WD →
Herkimer NY heavy $38.50 $25.04 $63.54 WD →
Otsego NY heavy $38.50 $25.04 $63.54 WD →
Otsego NY highway $38.50 $25.04 $63.54 WD →
Schuyler NY building $38.50 $25.04 $63.54 WD →
Schuyler NY highway $38.50 $25.04 $63.54 WD →
Schuyler NY heavy $38.50 $25.04 $63.54 WD →
Tioga NY heavy $38.50 $25.04 $63.54 WD →
Tioga NY building $38.50 $25.04 $63.54 WD →
Tioga NY highway $38.50 $25.04 $63.54 WD →
Top-paying counties for Asbestos/Insulator Worker HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming →