ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF — Prevailing Wage Rates

Davis-Bacon prevailing wages for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OFs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 240 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF is $57.48/hr, with the middle 80% of counties paying between $45.80 and $57.48/hr. The highest state average is California at $52.14/hr; the lowest is California at $52.14/hr.

Bottom 10%
$45.80
Median
$57.48
Average
$52.14
Top 10%
$57.48

Range: $36.89 – $57.48/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $39.73/hr
Avg total: $52.14/hr
240 rates

All Rates

240 county-level rates for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA heavy $44.73 $12.75 $57.48 WD →
Alameda CA residential $36.53 $9.27 $45.80 WD →
Alameda CA building $44.73 $12.75 $57.48 WD →
Alameda CA highway $44.73 $12.75 $57.48 WD →
Alameda CA residential $34.56 $11.40 $45.96 WD →
Alpine CA building $44.73 $12.75 $57.48 WD →
Alpine CA heavy $35.31 $12.75 $48.06 WD →
Alpine CA heavy $44.73 $12.75 $57.48 WD →
Alpine CA building $35.31 $12.75 $48.06 WD →
Alpine CA highway $44.73 $12.75 $57.48 WD →
Alpine CA highway $35.31 $12.75 $48.06 WD →
Amador CA heavy $44.73 $12.75 $57.48 WD →
Amador CA highway $44.73 $12.75 $57.48 WD →
Amador CA building $44.73 $12.75 $57.48 WD →
Amador CA building $35.31 $12.75 $48.06 WD →
Amador CA heavy $35.31 $12.75 $48.06 WD →
Amador CA highway $35.31 $12.75 $48.06 WD →
Butte CA heavy $44.73 $12.75 $57.48 WD →
Butte CA highway $44.73 $12.75 $57.48 WD →
Butte CA heavy $35.31 $12.75 $48.06 WD →
Butte CA highway $35.31 $12.75 $48.06 WD →
Butte CA building $44.73 $12.75 $57.48 WD →
Butte CA building $35.31 $12.75 $48.06 WD →
Calaveras CA building $44.73 $12.75 $57.48 WD →
Calaveras CA heavy $44.73 $12.75 $57.48 WD →
Calaveras CA highway $44.73 $12.75 $57.48 WD →
Colusa CA heavy $44.73 $12.75 $57.48 WD →
Colusa CA building $35.31 $12.75 $48.06 WD →
Colusa CA building $44.73 $12.75 $57.48 WD →
Colusa CA highway $44.73 $12.75 $57.48 WD →
Colusa CA highway $35.31 $12.75 $48.06 WD →
Colusa CA heavy $35.31 $12.75 $48.06 WD →
Contra Costa CA residential $36.53 $9.27 $45.80 WD →
Contra Costa CA residential $34.56 $11.40 $45.96 WD →
Contra Costa CA heavy $44.73 $12.75 $57.48 WD →
Contra Costa CA highway $44.73 $12.75 $57.48 WD →
Contra Costa CA building $44.73 $12.75 $57.48 WD →
El Dorado CA residential $36.53 $9.27 $45.80 WD →
El Dorado CA residential $34.56 $11.40 $45.96 WD →
El Dorado CA highway $44.73 $12.75 $57.48 WD →
El Dorado CA heavy $44.73 $12.75 $57.48 WD →
El Dorado CA heavy $35.31 $12.75 $48.06 WD →
El Dorado CA highway $35.31 $12.75 $48.06 WD →
El Dorado CA building $44.73 $12.75 $57.48 WD →
El Dorado CA building $35.31 $12.75 $48.06 WD →
Fresno CA heavy $44.73 $12.75 $57.48 WD →
Fresno CA building $44.73 $12.75 $57.48 WD →
Fresno CA highway $44.73 $12.75 $57.48 WD →
Glenn CA heavy $35.31 $12.75 $48.06 WD →
Glenn CA heavy $44.73 $12.75 $57.48 WD →
Glenn CA highway $35.31 $12.75 $48.06 WD →
Glenn CA highway $44.73 $12.75 $57.48 WD →
Glenn CA building $44.73 $12.75 $57.48 WD →
Glenn CA building $35.31 $12.75 $48.06 WD →
Inyo CA highway $23.52 $13.37 $36.89 WD →
Inyo CA building $23.52 $13.37 $36.89 WD →
Inyo CA heavy $23.52 $13.37 $36.89 WD →
Kern CA highway $23.52 $13.37 $36.89 WD →
Kern CA heavy $23.52 $13.37 $36.89 WD →
Kern CA building $23.52 $13.37 $36.89 WD →
Kings CA highway $44.73 $12.75 $57.48 WD →
Kings CA building $44.73 $12.75 $57.48 WD →
Kings CA heavy $44.73 $12.75 $57.48 WD →
Lassen CA highway $44.73 $12.75 $57.48 WD →
Lassen CA heavy $44.73 $12.75 $57.48 WD →
Lassen CA building $44.73 $12.75 $57.48 WD →
Lassen CA building $35.31 $12.75 $48.06 WD →
Lassen CA highway $35.31 $12.75 $48.06 WD →
Lassen CA heavy $35.31 $12.75 $48.06 WD →
Madera CA building $44.73 $12.75 $57.48 WD →
Madera CA heavy $44.73 $12.75 $57.48 WD →
Madera CA highway $44.73 $12.75 $57.48 WD →
Marin CA heavy $44.73 $12.75 $57.48 WD →
Marin CA highway $44.73 $12.75 $57.48 WD →
Marin CA building $35.31 $12.75 $48.06 WD →
Marin CA highway $35.31 $12.75 $48.06 WD →
Marin CA heavy $35.31 $12.75 $48.06 WD →
Marin CA residential $34.56 $11.40 $45.96 WD →
Marin CA residential $36.53 $9.27 $45.80 WD →
Marin CA building $44.73 $12.75 $57.48 WD →
Mariposa CA building $44.73 $12.75 $57.48 WD →
Mariposa CA heavy $44.73 $12.75 $57.48 WD →
Mariposa CA highway $44.73 $12.75 $57.48 WD →
Merced CA heavy $44.73 $12.75 $57.48 WD →
Merced CA highway $44.73 $12.75 $57.48 WD →
Merced CA building $44.73 $12.75 $57.48 WD →
Modoc CA building $44.73 $12.75 $57.48 WD →
Modoc CA heavy $44.73 $12.75 $57.48 WD →
Modoc CA highway $44.73 $12.75 $57.48 WD →
Modoc CA heavy $35.31 $12.75 $48.06 WD →
Modoc CA building $35.31 $12.75 $48.06 WD →
Modoc CA highway $35.31 $12.75 $48.06 WD →
Mono CA highway $23.52 $13.37 $36.89 WD →
Mono CA heavy $23.52 $13.37 $36.89 WD →
Mono CA building $23.52 $13.37 $36.89 WD →
Monterey CA building $44.73 $12.75 $57.48 WD →
Monterey CA residential $36.53 $9.27 $45.80 WD →
Monterey CA residential $34.56 $11.40 $45.96 WD →
Monterey CA heavy $44.73 $12.75 $57.48 WD →
Monterey CA highway $44.73 $12.75 $57.48 WD →
Top-paying counties for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF →