Heavy Construction — Juab, Utah

WD UT20260092-17851-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Juab, Utah (construction type: heavy) is $19.69/hr base + $1.17/hr fringe = $20.86/hr total package (WD UT20260092-17851-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: UT20260092-17851-hvy
Revision: 1
Construction Type: heavy
State: Utah (UT)
County: Juab
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference UT20260092View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $19.69 $1.17 $20.86 -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.23 $17.66 $58.89 +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.65 $8.59 $26.24 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.76 $0.00 $17.76 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.44 $10.04 $32.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.29 $0.00 $25.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.81 $13.03 $39.84 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.04 $16.09 $49.13 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $23.71 $9.78 $33.49 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.80 $11.41 $33.21 Top 10% +16% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Juab, UT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Juab

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260092-17851-hvy →