Building Construction — Juab, Utah
WD UT20260084-17851-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Juab, Utah (construction type: building) is $22.13/hr base + $1.67/hr fringe = $23.80/hr total package (WD UT20260084-17851-bld, Rev. 1).
Scroll down for all 26 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $22.13 | $1.67 | $23.80 -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.66 | $13.97 | $45.63 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.51 | $5.18 | $24.69 -1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $21.29 | $1.95 | $23.24 -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.57 | $0.00 | $19.57 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $19.23 | $4.85 | $24.08 Above median -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOR ALL HOURS WORKED, 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE | $55.43 | $38.44 | $93.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR - MECHANICAL | $15.28 | $1.65 | $16.93 Bottom 10% -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.48 | $0.00 | $14.48 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: IRRIGATION | $9.50 | $0.00 | $9.50 -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.79 | $0.00 | $14.79 Above median -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 | $16.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $19.34 | $0.00 | $19.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $26.00 | $8.78 | $34.78 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $12.00 | $0.00 | $12.00 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $46.10 | $15.83 | $61.93 +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.62 | $0.00 | $15.62 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $46.79 | $14.89 | $61.68 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $24.76 | $7.83 | $32.59 +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $13.54 | $0.00 | $13.54 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $23.00 | $0.00 | $23.00 -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.49 | $0.00 | $16.49 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Juab, UT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Juab
Compliance Notes
- This wage determination applies to federal contracts for building construction in Juab, Utah.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.