Highway Construction — Cache, Utah

WD UT20260105-17761-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Cache, Utah (construction type: highway) is $21.87/hr base + $2.80/hr fringe = $24.67/hr total package (WD UT20260105-17761-hwy, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: UT20260105-17761-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Cache
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference UT20260105View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $21.87 $2.80 $24.67 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.24 $6.20 $26.44 -1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.23 $17.77 $59.00 +100% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $19.52 $1.62 $21.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $13.76 $40.37 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $22.08 $8.65 $30.73 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.51 $5.84 $23.35 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.77 $4.08 $19.85 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.67 $3.54 $20.21 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.04 $7.27 $27.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.43 $3.31 $21.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $22.12 $8.72 $30.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $20.03 $6.55 $26.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.43 $11.60 $38.03 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.63 $11.88 $34.51 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $31.00 $15.65 $46.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $20.68 $6.84 $27.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.18 $9.73 $31.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.63 $10.53 $36.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.67 $9.13 $31.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $21.34 $9.59 $30.93 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $24.77 $12.40 $37.17 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.26 $11.47 $34.73 Above median +21% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cache, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cache

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260105-17761-hwy →