Heavy Construction — Cache, Utah

WD UT20260090-17761-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Cache, Utah (construction type: heavy) is $19.69/hr base + $1.17/hr fringe = $20.86/hr total package (WD UT20260090-17761-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: UT20260090-17761-hvy
Revision: 1
Construction Type: heavy
State: Utah (UT)
County: Cache
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference UT20260090View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $19.69 $1.17 $20.86 -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.23 $17.66 $58.89 +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.83 $3.29 $23.12 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.68 $1.96 $16.64 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.67 $5.17 $29.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.29 $0.00 $25.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $24.30 $5.67 $29.97 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.04 $16.09 $49.13 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $23.71 $9.78 $33.49 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $29.67 $14.65 $44.32 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cache, UT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cache

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260090-17761-hvy →