Building Construction — Cache, Utah

WD UT20260082-17761-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Cache, Utah (construction type: building) is $22.13/hr base + $1.67/hr fringe = $23.80/hr total package (WD UT20260082-17761-bld, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: UT20260082-17761-bld
Revision: 1
Construction Type: building
State: Utah (UT)
County: Cache
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference UT20260082View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $22.13 $1.67 $23.80 -12% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.70 $5.62 $26.32 +6% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.16 $0.00 $17.16 -36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.23 $17.66 $58.89 +99% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $17.76 $1.83 $19.59 -16% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.21 $3.22 $23.43 +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.69 $0.00 $12.69 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: IRRIGATION $9.50 $0.00 $9.50 -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $16.38 $1.00 $17.38 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.87 $0.14 $14.01 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.57 $0.00 $13.57 -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.92 $0.00 $16.92 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.34 $0.00 $19.34 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $15.33 $0.00 $15.33 -31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $46.10 $15.83 $61.93 +109% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.62 $0.00 $15.62 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $46.79 $14.89 $61.68 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $13.54 $0.00 $13.54 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $23.00 $0.00 $23.00 -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.24 $2.39 $19.63 Above median -31% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cache, UT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cache

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260082-17761-bld →