Residential Construction — El Paso, Texas

WD TX20260036-14866-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in El Paso, Texas (construction type: residential) is $7.25/hr base + $0.00/hr fringe = $7.25/hr total package (WD TX20260036-14866-res, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: TX20260036-14866-res
Revision: 1
Construction Type: residential
State: Texas (TX)
County: El Paso
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference TX20260036View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.25 $0.00 $7.25 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $7.34 $0.00 $7.34 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
INSULATION INSTALLER $7.25 $0.00 $7.25 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.25 $0.00 $7.25 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: ASHPALT RAKERS $7.25 $0.00 $7.25 -61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDERS $7.25 $0.00 $7.25 Above median -61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UNSKILLED $7.25 $0.00 $7.25 Above median -61% vs market $0.00 $0.00 $0.00 $0.00
LATHER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOES $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FORKLIFTS; FRONT END LOADERS $7.25 $0.00 $7.25 -70% vs market $0.00 $0.00 $0.00 $0.00
ROCKMASON $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
ROOFER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
TAPER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $8.00 $0.00 $8.00 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the El Paso, TX — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in El Paso

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260036-14866-res →