Building Construction — El Paso, Texas

WD TX20260245-14866-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in El Paso, Texas (construction type: building) is $33.17/hr base + $24.92/hr fringe = $58.09/hr total package (WD TX20260245-14866-bld, Rev. 1).

Scroll down for all 49 trade classifications covered by this determination.

WD Number: TX20260245-14866-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: El Paso
Effective: May 17, 2026
Trades covered: 49
Official source: SAM.gov reference TX20260245View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $16.17 $0.00 $16.17 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $12.81 $0.00 $12.81 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION $13.51 $3.29 $16.80 -27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.02 $0.00 $13.02 -42% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $12.81 $0.00 $12.81 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.50 $9.39 $38.89 +42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.38 $2.92 $18.30 -33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.09 $6.45 $25.54 -7% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $9.93 $1.83 $11.76 $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $12.81 $0.00 $12.81 -38% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: VINYL FLOORING $12.87 $0.00 $12.87 Top 10% -38% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $12.57 $1.03 $13.60 $0.00 $0.00 $0.00 $0.00
GLAZIER $15.86 $1.00 $16.86 Bottom 10% -24% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $16.91 $0.00 $16.91 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.60 $0.00 $15.60 -34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.37 $4.34 $19.71 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.30 $0.00 $9.30 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: DRILLER $14.12 $1.01 $15.13 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $10.00 $0.00 $10.00 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.50 $2.30 $14.80 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.82 $0.96 $11.78 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.00 $3.47 $14.47 -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $10.06 $0.00 $10.06 -45% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.43 $0.74 $15.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.29 $1.31 $19.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.83 $0.00 $14.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.50 $1.05 $20.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.87 $0.70 $13.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.00 $0.00 $17.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.70 $0.00 $12.70 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $12.50 $0.00 $12.50 -41% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $18.15 $0.98 $19.13 -32% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.74 $15.35 $56.09 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $11.42 $0.00 $11.42 -48% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.13 6.53 SHEET METAL WORKER $23.56 $3.60 $27.16 +1% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $38.57 $24.47 $63.04 +124% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $12.02 $0.00 $12.02 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the El Paso, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in El Paso

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260245-14866-bld →