Heavy Construction — El Paso, Texas

WD TX20260035-14866-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in El Paso, Texas (construction type: heavy) is $12.21/hr base + $0.00/hr fringe = $12.21/hr total package (WD TX20260035-14866-hvy, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: TX20260035-14866-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: El Paso
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference TX20260035View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $12.21 $0.00 $12.21 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.29 $0.00 $9.29 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: HEAVY CONSTRUCTION $27.50 $9.30 $36.80 +35% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $8.48 $0.00 $8.48 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $7.96 $0.00 $7.96 -57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $11.57 $0.00 $11.57 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FRONT END LOADER $10.43 $0.00 $10.43 -56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER $11.19 $0.00 $11.19 -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $9.17 $0.00 $9.17 -64% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the El Paso, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in El Paso

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260035-14866-hvy →