Davis-Bacon Wage Determinations — Polk, Minnesota

Polk has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Polk, Minnesota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MN20260086-15536-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MN20260232-15536-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MN20260232-15536-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MN20260024-15536-res Rev. 2
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Polk

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELEVATOR CONSTRUCTORS building $62.52 $45.36 $107.88 WD →
2 IRONWORKER residential $46.35 $36.86 $83.21 WD →
3 IRONWORKER: STRUCTURAL residential $46.35 $36.86 $83.21 WD →
4 BOILERMAKER highway $48.35 $31.93 $80.28 WD →
5 PLUMBER residential $47.50 $30.33 $77.83 WD →
6 MILLWRIGHT highway $48.13 $29.41 $77.54 WD →
7 GLAZIER building $48.98 $26.75 $75.73 WD →
8 PILEDRIVER heavy $45.71 $29.73 $75.44 WD →
9 Piledriver heavy $45.71 $29.73 $75.44 WD →
10 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET building $48.53 $26.40 $74.93 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →