Wage Determination MN20260024-15536-res

Polk, MN · residential · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MN20260024-15536-res covers 36 trade classifications for residential construction in Polk, MN. Total packages (base + fringe) range from $11.50/hr to $83.21/hr, with the highest going to IRONWORKER: STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MN20260024-15536-res
Revision: 2
Type: residential
County: Polk
State: MN
Effective: May 17, 2026
Trades covered: 36
Highest rate: $83.21/hr
Official source: SAM.gov reference MN20260024View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
CARPENTER $31.14 $20.69 $51.83 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $23.32 $63.57 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.41 $18.61 $56.02 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $42.89 $36.86 $79.75 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 (POLK) $23.86 $21.74 $45.60 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 (POLK) $28.07 $21.74 $49.81 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (POLK) $24.20 $21.74 $45.94 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (POLK) $28.47 $21.74 $50.21 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (CLAY) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $20.21 $14.97 $35.18 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 2 PIPELAYER (CLAY) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $20.96 $14.97 $35.93 $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL $27.25 $17.52 $44.77 $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER, PIPELAYER (CLAY COUNTY $18.60 $13.44 $32.04 $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER, PIPELAYER (POLK COUNTY) $20.87 $17.39 $38.26 $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER $25.42 $17.52 $42.94 $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYER $27.95 $17.52 $45.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $32.98 $15.85 $48.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.85 $50.70 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $31.33 $15.85 $47.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.85 $48.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $31.17 $15.85 $47.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.85 $48.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $29.75 $15.85 $45.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $26.80 $15.85 $42.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8OILER..$ 28.29 15.85 OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.85 $47.27 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.00 $3.00 $22.00 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.61 $8.66 $31.27 $0.00 $0.00 $0.00 $0.00
PLUMBER $47.50 $30.33 $77.83 $0.00 $0.00 $0.00 $0.00
PLUMBER $48.74 $21.34 $70.08 $0.00 $0.00 $0.00 $0.00
ROOFER $36.01 $16.72 $52.73 $0.00 $0.00 $0.00 $0.00
ROOFER $32.71 $16.99 $49.70 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.37 $21.12 $56.49 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.76 $23.17 $58.93 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.03 $28.95 $68.98 $0.00 $0.00 $0.00 $0.00
View all WDs for Polk → Revision history →