Building Construction — Polk, Minnesota

WD MN20260086-15536-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Polk, Minnesota (construction type: building) is $17.00/hr base + $0.00/hr fringe = $17.00/hr total package (WD MN20260086-15536-bld, Rev. 1).

Scroll down for all 60 trade classifications covered by this determination.

WD Number: MN20260086-15536-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Polk
Effective: May 17, 2026
Trades covered: 60
Official source: SAM.gov reference MN20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $17.00 $0.00 $17.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $31.78 $19.35 $51.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $44.54 $26.88 $71.42 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.73 $29.01 $70.74 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.00 $24.95 $56.95 +83% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $29.03 $18.71 $47.74 +21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $40.32 $20.69 $61.01 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.88 $71.42 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.76 $23.84 $57.60 +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.05 $17.96 $56.01 +43% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $15.08 $0.00 $15.08 $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $29.14 $19.11 $48.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.19 $35.68 $76.87 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $27.28 $23.82 $51.10 +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $32.09 $23.92 $56.01 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $21.17 $13.99 $35.16 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $27.28 $23.82 $51.10 +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $32.09 $23.92 $56.01 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LATHER $27.03 $20.71 $47.74 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.53 $26.40 $74.93 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.18 $25.33 $64.51 +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $27.50 $1.49 $28.99 -1% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $24.86 $10.59 $35.45 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $47.03 $27.91 $74.94 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $43.54 $20.89 $64.43 +61% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $23.89 $14.90 $38.79 $0.00 $0.00 $0.00 $0.00
PLASTERER $33.22 $18.33 $51.55 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.54 $20.89 $64.43 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $43.35 $22.85 $66.20 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $46.01 $23.65 $69.66 Bottom 10% +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $46.67 $26.88 $73.55 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $37.75 $21.70 $59.45 +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $13.00 $4.35 $17.35 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $34.94 $26.40 $61.34 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $19.75 $4.35 $24.10 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $25.00 $1.25 $26.25 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $21.64 $10.24 $31.88 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $13.00 $4.35 $17.35 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.40 $68.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROOFER $37.51 $18.19 $55.70 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.09 $20.97 $58.06 +93% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $27.10 $13.42 $40.52 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $37.58 $19.99 $57.57 +44% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, +$760,000 $20.02 $16.69 $36.71 $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, -$760,000 $17.02 $16.69 $33.71 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $37.58 $16.83 $54.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $22.80 $5.39 $28.19 -5% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.19 $13.33 $53.52 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON, TEMPORARY SIGNAGE $17.02 $16.69 $33.71 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON, TEMPORARY SIGNAGE $20.02 $16.69 $36.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $21.75 $4.27 $26.02 Bottom 10% -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $18.71 $10.24 $28.95 -1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $21.64 $10.24 $31.88 +9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $16.90 $4.35 $21.25 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $15.00 $4.35 $19.35 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $28.00 $7.20 $35.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $16.63 $47.88 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Polk, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Polk

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260086-15536-bld →