Residential Construction — Pine, Minnesota

WD MN20260012-15535-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Pine, Minnesota (construction type: residential) is $7.25/hr base + $0.00/hr fringe = $7.25/hr total package (WD MN20260012-15535-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: MN20260012-15535-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Pine
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference MN20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $7.25 $0.00 $7.25 Bottom 10% -83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.80 $0.00 $7.80 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.00 $7.25 Bottom 10% -76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $8.20 $0.00 $8.20 Bottom 10% -79% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $7.97 $0.00 $7.97 Bottom 10% -80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $7.25 $0.00 $7.25 Bottom 10% -81% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.25 $0.00 $7.25 Bottom 10% -81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.25 $0.00 $7.25 Bottom 10% -76% vs market $0.00 $0.00 $0.00 $0.00
SHEET ROCK INSTALLER $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
TILE SETTER $7.25 $0.00 $7.25 Bottom 10% -76% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, DUMP $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pine, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pine

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260012-15535-res →